top of page
Modern Architectural Angles

Selected Work

CH Architect’s work spans institutional, infrastructure, and residential contexts. 

01

Mamawi Atosketan Centre

rawrendermaskwasicsfeb12updated.jpg

Role: Design Consultant 

The Mamawi Atosketan Centre is a community-focused facility being developed in partnership with the Maskwacis community, Eagle Builders and the Alberta Adventist Church. Led by primary designer Ciaran Head-Smith, a Cree artist and designer, the project draws upon Indigenous knowledge, cultural values, and community aspirations to create a welcoming and meaningful place for gathering, learning, and support. Through ongoing consultation and collaboration, the building's design reflects the unique identity of Maskwacis while fostering connection, belonging, and long-term community well-being.

2017-lebreton-flats-project1.jpg

02

LeBreton Flats Redevelopment - Ottawa

A major mixed-use redevelopment of Ottawa's LeBreton Flats - one of the most significant urban redevelopment opportunities in the National Capital Region - intended to establish a new national destination comprising housing, public space, cultural uses, and a new NHL arena.

The original procurement, which CH Architect supported, was cancelled following ownership issues with the Ottawa Senators; the project has since been retooled and relaunched and continues under a revised framework.

Role: Senior Architect and Selection Committee Member (4 years), NCC. Led development of the RFP and procurement process design while providing strategic architectural advisory to NCC Board and senior leadership through project initiation, bid evaluation, and proponent engagement. Work at this scale - coordinating technical judgment with governance, political, and stakeholder complexity - is central to what CH Architect brings to owner-side advisory mandates today.

03

City Center - Washington DC

Role: Project Architect - Shalom Baranes Associates / Foster + Partners. Coordinated condominium building design and interior finishes, working closely with the design principal at Foster + Partners (London).

A large-scale, luxury mixed-use redevelopment on the former Washington Convention Center site, comprising residential, office, hotel, retail, and public space, designed as a pedestrian-oriented, LEED-certified urban district.

CityCenterDC_08-25_01_hres.jpeg
Le Germain Hotel Ottawa.jpg

04

Ottawa Art Gallery

Role: Senior Designer (Concept Stage) - KPMB Architects 

 

The Ottawa Art Gallery redevelopment required integrating a new contemporary gallery building with the heritage Arts Court structure in a downtown context with strong civic expectations and complex ownership.  At concept stage, the challenge was translating a multi-stakeholder brief into a spatially coherent and technically feasible option set - leading feasibility studies, functional programming, and early stakeholder coordination across disciplines to create a durable foundation for subsequent design phases.

05

Hennick Bridgepoint Hospital - Toronto

Role: Project Architect - Diamond Schmitt Architects / Stantec / HDR Architecture 

 

Bridgepoint represents a healthcare environment of unusual complexity: a purpose-built rehabilitation hospital integrated with the adaptive reuse of the historic Don Jail, on a constrained urban site, with high public visibility and significant heritage obligations.  As Project Architect, the focus was on coordinating building envelope and public space design across a large, multi-disciplinary team - ensuring that the architectural ambition of the project was carried through at the technical and stakeholder interface, not just at the concept stage.

Bridgepoint-Hospital-Aerial-View_jpg.jpg
bay-adelaide-centre-03.jpg

06

Bay Adelaide Centre East Tower 

Role: Project Architect - KPMB Architects / Adamson Associates

Supported design development and coordination for the tower and podium, collaborating closely with design leadership and consultant teams to refine architectural expression and technical delivery.

 

A 1.22 million ft² LEED Platinum office tower and podium forming a key phase of the Bay Adelaide Centre in Toronto’s Financial District. The East Tower’s design balances urban scale with refined materiality and contextual integration, contributing to a unified mixed-use complex focused on workplace excellence and civic presence. KPMB

 

07

Federal Design and Heritage Advisory - Ottawa

Role: Senior Architect and Federal Approvals Coordinator, NCC

Owner-side heritage advisory and federal approval coordination across a range of significant protected buildings and cultural landscapes in the National Capital Region, including the National Arts Centre renovation; the UNESCO Rideau Canal corridor (Château Laurier addition, Rogers Centre); Rideau Hall and its grounds, including coordination of the federal approval for the new Queen's Entrance, inaugurated in 2017; and the Westboro Beach Pavilion (FHBRO evaluation).

 

Coordinated heritage review processes, struck and chaired interdepartmental review committees, and provided architectural judgment at the owner and approval interface across multiple concurrent federal mandates.

Credit Ottawa Tourism - Capital Illumination Plan.png

08

Whidbey Island Residence - Washington State

Role: Principal Architect. - CH Architect

Renovation and rehabilitation of a mid-century ranch house overlooking Saratoga Sound, reconfigured to improve daylight, views, and long-term livability.Led design and delivery, including spatial reorganization, envelope upgrades, and a new study and library.

BWP_Whidbey Is Residence-5.jpg
bottom of page